Address: Room 1402, No. 55, Haibin South Road, Jinghai District, Weihai Tel:0086-631-5272711

搜索
Search

NEWS

The company always pursues the business philosophy of "customer is God", repairing each boat and satisfying the shipowner.

What is the daily maintenance of the ship?

  • Categories:News
  • Author:
  • Origin:
  • Time of issue:2019-06-24 04:07
  • Views:

(Summary description)Daily maintenance and repair work of the ship is divided into three types: daily maintenance, monthly maintenance and suspension maintenance. Among them, the suspension and maintenance are divided into semi-annual maintenance and annual maintenance.

What is the daily maintenance of the ship?

(Summary description)Daily maintenance and repair work of the ship is divided into three types: daily maintenance, monthly maintenance and suspension maintenance. Among them, the suspension and maintenance are divided into semi-annual maintenance and annual maintenance.

  • Categories:News
  • Author:
  • Origin:
  • Time of issue:2019-06-24 04:07
  • Views:
Information

1. Daily maintenance and repair work of the ship is divided into three types: daily maintenance, monthly maintenance and suspension maintenance. Among them, the suspension and maintenance are divided into semi-annual maintenance and annual maintenance.

2, daily maintenance: in the form of a daily maintenance work schedule (A, B maintenance). The main contents are: to do a good job in the cleaning and sanitation of the ship environment and equipment, to check the equipment and eliminate the "three leaks" (water, oil, gas), check the specific gravity of the battery and electrolyte, check the oil cabinet, engine, gear box, etc. Oil level, expansion tank level of cooling water level, etc.

3, monthly maintenance: in the form of a monthly maintenance work plan (C, D-level maintenance). The main contents are: checking the fastening of deck equipment and the effectiveness of waterproofing and sun protection devices, checking the sealing performance of windows, doors and covers (weather and wind); cleaning or replacing fuel, oil filters and air filters; checking equipment such as mainframes Lubrication state; add lubricant to the equipment at regular intervals. Wind oil cut-off, fire alarm, centralized monitoring routine inspection; check hydraulic seal line sealing performance, oil quality; check pump water seal, tail shaft oil, water seal sealing, etc.; other necessary maintenance work.

4. Semi-annual maintenance: The planned maintenance project shall be prepared by the ship (D and E-level maintenance), and shall be executed after approval. The main contents are: checking the corrosion of cabins, decks, fenders, etc., partial rust removal, touch up; inspection of shafting and piping; dismantling of main and auxiliary machines, electrical equipment or replacement parts; inspection of rudder system and other navigation equipment . Other necessary overhauls.

5. Annual maintenance: The planned maintenance project is prepared by the ship (E and F maintenance) and will be executed after approval. Its main contents are: superstructure siding, decks, hull plating, deck machinery and its piping derusting, paint and so on. The maintenance and repair of main and auxiliary equipment shall be carried out according to its “maintenance manual”, and other items shall be implemented with reference to the semi-annual maintenance project.

2, daily maintenance: in the form of a daily maintenance work schedule (A, B maintenance). The main contents are: to do a good job in the cleaning and sanitation of the ship environment and equipment, to check the equipment and eliminate the "three leaks" (water, oil, gas), check the specific gravity of the battery and electrolyte, check the oil cabinet, engine, gear box, etc. Oil level, expansion tank level of cooling water level, etc.

3, monthly maintenance: in the form of a monthly maintenance work plan (C, D-level maintenance). The main contents are: checking the fastening of deck equipment and the effectiveness of waterproofing and sun protection devices, checking the sealing performance of windows, doors and covers (weather and wind); cleaning or replacing fuel, oil filters and air filters; checking equipment such as mainframes Lubrication state; add lubricant to the equipment at regular intervals. Wind oil cut-off, fire alarm, centralized monitoring routine inspection; check hydraulic seal line sealing performance, oil quality; check pump water seal, tail shaft oil, water seal sealing, etc.; other necessary maintenance work.

4. Semi-annual maintenance: The planned maintenance project shall be prepared by the ship (D and E-level maintenance), and shall be executed after approval. The main contents are: checking the corrosion of cabins, decks, fenders, etc., partial rust removal, touch up; inspection of shafting and piping; dismantling of main and auxiliary machines, electrical equipment or replacement parts; inspection of rudder system and other navigation equipment . Other necessary overhauls.

5. Annual maintenance: The planned maintenance project is prepared by the ship (E and F maintenance) and will be executed after approval. Its main contents are: superstructure siding, decks, hull plating, deck machinery and its piping derusting, paint and so on. The maintenance and repair of main and auxiliary equipment shall be carried out according to its “maintenance manual”, and other items shall be implemented with reference to the semi-annual maintenance project.

Scan the QR code to read on your phone

Weihai Dingsheng Ship Engineering Co., Ltd.

While serving the global ship and providing quality services to the shipowners, the company always pursues the business philosophy of “customer is God”, repairing each ship and satisfying the shipowner.

Add:Room 1402, 55 Haibin South Road, Weihai Economic and Technological Zone

Tel:0086-631-5272711

Copyright: Weihai Dingsheng Ship Engineering Co., Ltd.          鲁ICP备19028915号-1         Powered by www.300.cn